Here are more pictures from the MiniBooNE site taken on the week of March 12th, 2001. Since PMTs are now inside the tank no flash was used there, so some of the pictures are a little blurry due to my using long exposure times without a tripod. I've actually left out quite a few pictures that were (IMHO) unacceptably blurry. If anyone wants to see these, let me know. (I haven't deleted them yet.)

Assorted pictures...

Up top View through the tophat
Another view through the tophat And another view through the tophat
Up top w/ scope for splice testing, etc. Veto cluster visible through gap
Some veto tubes coming in Inner sphere taking shape
Stan making a splice At the boundary
At the boundary again The first main tube
More of the first main tube More of the first main tube
The first row of main tubes forming The installed but unspliced first row
E898 sign out front E898 sign out front, up close
Stan at work Spliced tubes (and Mike)
Progress Progress
Progress Progress (and Bill)



Fancy stuff...

180 degree panorama of computer room from entryway
Animation of tophat removal [Large 2.5MB AVI]
Animation of tophat removal [Small 0.7MB AVI]
Animation of tophat removal [Small 0.5MB GIF]