Here are some pictures from the MiniBooNE site taken between 29-Jan-01 and 02-Feb-01. I've left for you, the viewer, the fun of piecing together the chronology.


In the computer room...

The snake pit (with 3/16ths of the cables in place) Top hat area
View from ladder Another view from ladder [hi-res]
Faraday cage being reassembled Got rope?
Mike examining the top level of scaffolding Bolt removal
The safety chains are installed. Random view along preamp rack



Down below...

Mike on the stairs Looking down from stairs
Tank from below Manhole into tank



Inside...

Preamp-to-PMT cables running down the wall More cables along wall
Cables entering at top hat



Miscellany...

Group photo #1 [hi-res] Group photo #2 (almost identical) [hi-res]
Fun with (bad) digital editing Questionable time-lapse animated GIF of cable installation [0.9MB]
Same time-lapse, larger size, smoother format (AVI) [5.5MB]